PLANNING SANITY HERE |
![]() HELP US HELP YOU our work relies upon your donations and subscriptions to survive |
A DONATION TO PLANNING SANITY HERE |
| Email Planning Sanity |
HOME PAGE |
OTHER FORUMS |
Important Legal Notice |
| Need representation at an inquiry or a formal written presentation to your planning or village green authority. Planning Sanity may be able to help see our representation forum for more details. |
![]() |
SELF ADHESIVE VINYL LETTERS SIGNS AND NUMBERS
quality assured products designed just for you sales@sew-n-print.co.uk Visit Our Web Site |
![]() |
|
|
| The following colour scheme applies to docs on this site | Word Docs | PDF Docs | HTML Docs |
| Return to Telemast Forum |
Mr Justice Sullivan in a ground breaking case The Queen on the application of Wandsworth Borough Council 'v' Secretry of State for Transport Local Government and the Regions and 02 UK Ltd has ruled that the height of ground based masts that are being considered under the Prior Approval Process must include the headgear. It had been normal practice for operators to install a 15m mast plus the headgear and antenna taking the whole development to approximately 17.6 metres. The rulling effectively makes all these installations unlawful.
A reading of the relevant section of Part 24 A.1(a) of the GPDO clearly has the words 'excluding antenna', the judge has stated that the measurement cannot exceed 15 metres (including the headgear but not the antenna), this is because the antennas are mounted on a frame (headgear) and this is not included within the term antenna. Similar wording can be found in GPDO A.1(b) the alteration of existing installations that would bring the installation above 15m.
GPDO A.1(a)
This opens up the flood gates to those masts that come within this special category to pressure the local planning authority to take enforcement action against Code System Operators. Putting the case that the judgment effectively means that all such installations are ultra vires (beyond the limits of the powers conferred on the local planning authority). Which in real terms means that for existing installations that were wrongly approved under prior approval procedures within the last 4 years could be challenged, enforcement action taken, and potentially have the mast removed. Potentially must be emphasised, for two reasons, the Operator would in practice apply for restrospective planning permission, and the LPA might grant it, or an inspector on appeal might grant it. The LPA also have a discresion as to whether to take enforcement action, they might choose not to.
For future applications of course the question is much more simple the Operator can only apply for prior approval where the mast including the headgear, but excluding the antenna (and lightning conductor which is deemed to be de minimis) cannot be more than 15 metres, which in real terms brings the mast down in height to 12.5 metres. This means that for all other ground based masts (those on building and other structures do not come within this remit) require full planning permission.
To emphasise the need for the LPA to take enforcement action refer them to the Planning and Compulsory Purchase Act 2004 where the Government has strenghened the enforcement procedures introducing a new temporary stop notice that comes into immediate effect on it being served, as opposed to the old 3 day time lag. Traditionally enforcement action is only taken by LPAs in a reative way by responding to complaints, therefore it is important to make sure you complain, and keep up the pressure until action is taken. If the development remains in place for 4 years without enforcement action being taken, then effectively the development becomes time barred from challenge.
Standard letter requesting enforcement action be taken by the LPA on masts over 15 metres.
© Planning Sanity - August 2008 (can be freely used by local communities within their campaigns.
Publication by third parties is permitted providing acknowledgment of Planning Sanity is given)